Most viewed - print_P01401-P01600 |
P01436163 views11 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being placed into position on pylons.
|
|
P01546162 views3 of 3 views of the Commissioner of Railways, Mr R Pascoe posing in front of G class 233, Perth, feigning oiling the loco
|
|
P01567162 viewsCulvert under construction, standard gauge construction, Avon Valley line
|
|
P01571162 viewsCutting "C3" being excavated, standard gauge construction, Avon Valley line, blasting taking place.
|
|
P01494157 viewsTrestle bridge under construction, Zanthus, TAR line. (ref "The Westland", April 1995, p.8)
|
|
P01569157 viewsCutting "C2" being excavated, standard gauge construction, Avon Valley line, view into the cutting.
|
|
P01570156 viewsCutting "C2" being excavated, standard gauge construction, Avon Valley line, view back to the entrance into the cutting.
|
|
P01514155 viewsWork on track construction at a display of new equipment for the CCE
|
|
P01488154 viewsSignalling and line signalling room, Forrestfield.
|
|
P01566153 viewsConcrete girder bridge, standard gauge construction, Avon Valley line. Under construction.
|
|
P01475152 viewsBanks of relays, signal relay room. Location Unknown.
|
|
P01506152 viewsNew Administration and station building, Northam, streetside view.
|
|
P01508151 viewsStation building, Kambalda on the standard gauge Binduli Bypass, trackside and end view.
|
|
P01491147 viewsBanks of relays, relay room, Control tower, Forrestfield
|
|
P01476142 viewsBanks of relays, signal relay room. Location Unknown.
|
|
P01516142 viewsWork on track construction at a display of new equipment for the CCE
|
|
P01489140 viewsSignalling equipment, Forrestfield
|
|
P01490137 viewsSignalling equipment, Forrestfield
|
|
P01520137 viewsApprentice coppersmith, welding
|
|
P01517136 viewsWork on track construction at a display of new equipment for the CCE
|
|
200 files on 10 page(s) |
|
|
|
|
|
|
|
10 |
|